Calendar
December 2018
M T W T F S S
« Nov    
 12
3456789
10111213141516
17181920212223
24252627282930
31  
Blog Categories
Forms To Fill
Follow Us
admin, Autor en karunamayafoundationepal.org - Page 2 of 4
1
archive,paged,author,author-admin,author-1,paged-2,author-paged-2,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,qode-theme-ver-8.0,wpb-js-composer js-comp-ver-4.9.2,vc_responsive

Author: admin

  • All
  • Education
  • Eventos
  • Laprak Project
  • Makaising Project
  • Nepal News
  • Projects
  • Solidary Trip
IMG-20160724-WA0000
Solidary Concert in Madrid

Last July 22nd we celebrated a Solidary Concert in Madrid. The event took place in a traditional theater in the center of Madrid, Infanta Isabel Theater.  The Pura Fibra Band, played Rock and Roll for more than two hours with an enthusiastic public, having great fun.. More than 150 friends came...

cooperarq 500x550
COOPERARQ Feria de voluntariado en ETSAM Madrid

Los días 20 y 21 de Abríl de 11 a 19h  habrá una representación de veinte ONG con sus respectivos Programas de Voluntariado en la Escuela Técnica Superior de Arquitectura de Madrid. [vc_separator type="transparent" position="center" up="1" down="0"][blockquote text="Han sido dos días muy intensos pero productivos. Hemos contactado con distintas ONG y...

happy new year500x350
Naya Barsha HAPPY NEPALI NEW YEAR 2073

The Nepali New Year, (known as Naya Barsha or Nawa Barsha in Nepal) is the first day of the Bikram Sambat Nepali Calendar year. This is the day of 1st Baisakh, which lies in mid-April (usually this day coincides with the 13th of April) according to the International Calendar, and...

  • swesta 500x350
  • SPP ProjectUpdate March18-5 family
  • visit swesta 500x350
Field visited by Project Coordinator Swestha Dhungel

The term minimalism is also used to describe a trend in design and architecture where in the subject is reduced to its necessary elements. Minimalist design has been highly influenced by Japanese traditional design and architecture. In addition, the work of De Stijl artists is a major source of reference...

  • _Ilast fase 500x 300
  • estado de la obra 8 de abril detalle 500x300
The construction is at the last phase

[vc_row][vc_column][vc_column_text] [gallery link="none" ids="17110,17109"] [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text] The Construction Work Is At The Last Phase. March 18th The construction work of Shree Prajawasti Primary School, is at the last phase of the completion of the work though there were different challenges and obstacles on the way during the construction period. .[/vc_column_text][vc_separator type="transparent" position="center" up="2" down="0"][blockquote text=" It is...

Women pose with coloured powder on their hands as they celebrate "Basant Utsav"or Spring festival at Shantiniketan, 200 km (124 miles) north of Kolkata March 21, 2008.The tradition of Holi, also known as Festival of Colours, which is celebrated by Hindus falls on Saturday.     REUTERS/Jayanta Shaw (INDIA)
Holi

Holi Festival in Nepal. It is an ancient Hindu religious festival, is a spring festival in Nepal and India, also known as the” festival of colours” lt is celebrated at the approach of the vernal equinox, on the Full Moon falling somewhere between February-March. The festival signifies the victory of good over evil, the arrival of...

  • obra2 marzo500x300
  • obra 4 500x300
  • obra marzo2 500x300
  • obra marzo 1 500x300
The construction work is going smoothly.

  [gallery link="none" columns="4" ids="17125,17124,17121,17120"]   Report Period : 3rd March 2016 Project Name : Shree Prajawasti Primary School, Makaising-3 Bardada, Gorkha Prepared by : Swesta Dhungel, Project Coordinator THE CONSTRUCTION WORK IS GOING SMOOTHLY March 3rd The construction work of Shree Prajawasti Primary School, Makaising-3 Bardada, Gorkha is going smoothly though there was the problem...

  • obraFeb17-50x300
  • obra 17 de febrero 500x300
  • mujeres en nuestra obra500x300
  • 17fe obra500x300
The construction work is in full progress.

[vc_row][vc_column][vc_column_text] [gallery link="none" columns="4" ids="17266,17265,17264,17263"] [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text] Construction Update We have already started the second building for the classrooms. Once there, we’ve been discussing about aditional projects: a retention wall, a gate, a boundary wall, and some paviment in the center, which was not included in the initial project plan. Another critical project is to...