Calendar
September 2023
M T W T F S S
« Nov    
 123
45678910
11121314151617
18192021222324
252627282930  
Blog Categories
Forms To Fill
Follow Us
Projects Archives - karunamayafoundationepal.org
80
archive,category,category-projects,category-80,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,qode-theme-ver-8.0,wpb-js-composer js-comp-ver-4.9.2,vc_responsive

Projects

fuente 2 julio 17
Field report July 2017. The purpose of the visit assures the project is being built in general conformance with the project.

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text] 1. Introduction This report presents the results of site observation of the reconstruction of Shree Prajawasti Primary School, Bardada, Makaising-03, Gorkha, from 27 July, 2017 to 31 July, 2017. The purpose of the visit assures the project is being built in general conformance with...

6cb2a25e-c174-4eb5-90b5-37bd3e50638b
June 2017 Field Visit to Shree Prajawasti & Community Meeting

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text] 1. Introduction This report presents the results of site observation of the reconstruction of Shree Prajawasti Primary School, Bardada, Makaising-03, Gorkha, from 11 June, 2017 to 17 June, 2017. The purpose of the visit assures the project is being built in general conformance with...

Field reportApril7 to 10-1
April 2017 Visit Report to Shree Prajawasti Primary School, Makaising-03, Gorkha

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_empty_space][vc_column_text] 1. Introduction This report presents the results of site visit of the reconstruction of Shree Prajawasti Primary School, Bardada, Makaising-03, Gorkha, from 07 April, 2017 to 10 April, 2017 with project coordinator, project engineer, social mobiliser(volunteer). The purpose of the visit assures the project...

2b5cce56-e481-4c3f-b285-0ef670d21601
The construction work for Shree Prajawasti School, is now at the phase of completion.

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text] Field visit by Project Coordinator (Swesta) 11th December, 2016 to 14th December, 2016 for the regular field visit of the construction site and payment of the workers in the site. She also distributed warm winter clothes to the new born babies’ mother and...

setting-the-windows-nov16
The construction work is full progress after two months stopped.

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_empty_space][vc_column_text] The construction work for Shree Prajawasti Primary School, Maikaising -3 Bardada, Gorkha is in full progress after 24th November 2016 although the construction work was stopped for few months due to delay in delivery of construction materials and road blockade from landslide from...

  • _Ilast fase 500x 300
  • estado de la obra 8 de abril detalle 500x300
The construction is at the last phase

[vc_row][vc_column][vc_column_text] [gallery link="none" ids="17110,17109"] [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text] The Construction Work Is At The Last Phase. March 18th The construction work of Shree Prajawasti Primary School, is at the last phase of the completion of the work though there were different challenges and obstacles on the way during the construction period. .[/vc_column_text][vc_separator type="transparent" position="center" up="2" down="0"][blockquote text=" It is...

  • obra2 marzo500x300
  • obra 4 500x300
  • obra marzo2 500x300
  • obra marzo 1 500x300
The construction work is going smoothly.

  [gallery link="none" columns="4" ids="17125,17124,17121,17120"]   Report Period : 3rd March 2016 Project Name : Shree Prajawasti Primary School, Makaising-3 Bardada, Gorkha Prepared by : Swesta Dhungel, Project Coordinator THE CONSTRUCTION WORK IS GOING SMOOTHLY March 3rd The construction work of Shree Prajawasti Primary School, Makaising-3 Bardada, Gorkha is going smoothly though there was the problem...

  • obraFeb17-50x300
  • obra 17 de febrero 500x300
  • mujeres en nuestra obra500x300
  • 17fe obra500x300
The construction work is in full progress.

[vc_row][vc_column][vc_column_text] [gallery link="none" columns="4" ids="17266,17265,17264,17263"] [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text] Construction Update We have already started the second building for the classrooms. Once there, we’ve been discussing about aditional projects: a retention wall, a gate, a boundary wall, and some paviment in the center, which was not included in the initial project plan. Another critical project is to...

  • niebla 5 500x300
  • niebla 6 500x300
  • niebla3 500x300
  • niebla4 500x300
  • digging850x600
  • cerchas 1 500x300
Foundation Digging

Karunamaya Foundation Nepal Fortnightly Progress UpdateReport Period : 22nd January 2016 Project Name : Shree Prajawasti Primary School, Makaising-3 Bardada, Gorkha Prepared by : Swestha Dhungel, Project Coordinator After a long period of project planning and waiting, due to the on-going unavailability of fuel and gas in Nepal, the construction for Shree...